Consulting and Advisory Services
United States of America, North America
Balta Switching Surge Study
MHI was contracted by Otter Tail Power Co. to perform a Switching Surge Study on the Balta 230 kV Station.
Manitoba Hydro International Ltd. (MHI) provided the following services:
- Calculated maximum line-to-ground and phase-to-phase over-voltage data to which nearby radial-fed transformers may be subjected.
- Determined the expected energy absorption requirements of 230 kV lightning arresters for worst case capacitor energization at Balta.
- Determined an appropriate inrush/out-rush reactor design for the new shunt capacitor banks at Balta.
- Determined if there is any possibility of voltage magnification on nearby capacitor banks as a result of adding the Balta capacitors.
- Confirmed suitability of existing circuit breaker ratings at reconnected sub-stations.