Consulting and Advisory Services

North America, Canada

Fire Protection Assessment - Spillway Gates

MHI was contracted to provide the assessment of the fire protection systems in use at the Spillway Gate House Control Building structures at seven BC Hydro generating stations. The assessment identified the condition and adequacy of current systems and recommendations for improvements needed to bring the systems up to NFPA (National Fire Protection Association) Codes and Standards.

  • 0

Manitoba Hydro International Ltd. 211 Commerce Drive Winnipeg, Manitoba, Canada R3P 1A3

Eric Maxwell Marketing Manager Direct: 1 (204) 480-5585 E-mail: emaxwell@mhi.ca